Posted on February 17, 2022 by The Sage — 2 CommentsGetting Ready for The Pour Making a stable spot for the masonry heater. Looking east. Notice the walls dividing what was the office from the kitchen and dining room are gone. We aim to have one level floor based off of the kitchen, the only floor not changing. The plan is to have 2″ of rigid foam insulation and then a 4″ slab. Even with the bricks exhumed that’ll mean 4-5″ of dirt to be removed. The Green Room is fortunately lower though still needs a treatment. Closeup of the 2″x15″ air intake. The firebox door will be right above it. The wood frame will be removed once the foundation has set. Share this:FacebookMoreTwitterLike this:Like Loading... Related Post navigationPrevious post: Deconstruction of the Inner RoofNext post: Coming and Going 2 thoughts on “Getting Ready for The Pour” Gregory Shell February 18, 2022 Looks like it is coming together. Loading... sageshearth March 4, 2022 Thank you Gregory for the attention. Loading... Comments are closed.
Looks like it is coming together.
Thank you Gregory for the attention.