Posted on 2 Comments

Getting Ready for The Pour

Making a stable spot for the masonry heater.
Looking east. Notice the walls dividing what was the office from the kitchen and dining room are gone. We aim to have one level floor based off of the kitchen, the only floor not changing. The plan is to have 2″ of rigid foam insulation and then a 4″ slab. Even with the bricks exhumed that’ll mean 4-5″ of dirt to be removed. The Green Room is fortunately lower though still needs a treatment.
Closeup of the 2″x15″ air intake. The firebox door will be right above it. The wood frame will be removed once the foundation has set.

2 thoughts on “Getting Ready for The Pour

  1. Looks like it is coming together.

    1. Thank you Gregory for the attention.

Comments are closed.