Posted on

Now or Never

Suddenly it was decision time and we chose go; Alberto has a long job starting soon. Here is the day’s work:

Carpentry today included relocating the east facing window of the Mezzanine northwards to allow for the not fully framed 3’ door providing passage to a yet to be built exterior staircase. An interior staircase is located on the west side. 

The window with the last bit of visible Tyvek was moved to North to allow for a door to an exterior staircase. 

We think the dark gray looks terrific and have imagined a number of colors. The HOA color is not what we would ourselves choose for the building.