Demolition of the restaurant proper is underway. The first surprise was finding that all the bricks, meaning those in the Garden Room and Main Dining Room are simply sitting on sand, explaining why the floors were so cold.
One of the requirements for the Temp-Cast masonry heater is a 2″x15″ duct bringing in outside area. With the heater essentially centered in the building, this means about 25 feet of ducting to simply get to the outside. Being able to pop up the bricks and not have to cut through a slab is welcome.
No slab will make installing radiant heat in the dining areas much easier too. Out come the bricks, then some lite digging, 2″ of rigid foam and before you know it we are walking on pex in concrete.
Excavation of the legacy roof is also underway from inside the building. The exposed sections show that, like the Grand Canyon, the building has layers, and there will need to be many supports put in place to keep what ought to be kept where it ought to be.